Filling fuel for cryogenic engine to start
April 15th, 2010 - 12:51 pm ICT by IANS
Sriharikota (Andhra Pradesh), April 15 (IANS) Scientists were Thursday getting ready to launch an Indian-designed and built cryogenic engine to inject an advanced communication satellite into space. The filling of liquid fuel that will power the third stage of the 50-metre tall, 416-tonne Indian rocket to inject the satellite in geo-synchronous orbit is expected to start around 11.30 a.m.
The filling super cooled liquid hydrogen as fuel and liquid oxygen (oxidiser) for the cryogenic engine (12.5 tonnes) will continue minutes before the rocket blasts off from the second launch pad at the spaceport, around 80 km from here.
The rocket, Geosynchronous Satellite Launch Vehicle (GSLV-D3), is slated to inject GSAT-4, an advanced communication satellite into geo transfer orbit (GTO) Thursday evening.
“Preparations for fuelling the cryo engine is going on. Filling of liquid propellants in the second stage (40 tonnes) and the four strap-on motors (42 tonnes each) that will be hugging the rocket are over,” Indian Space Research Organisation (ISRO) director S. Satish told IANS from Sriharikota.
ISRO officials are confident of a smooth and successful launch, he said.
The countdown for the blast off for the Rs.330 crore mission (rocket Rs.180 crore, GSAT-4 satellite Rs.150 crore) started Wednesday at 11.27 a.m.
The first stage with 138 tonnes solid fuel is all ready to be fired up.
The rocket is expected to blast off at 4.27 p.m. Thursday to deliver the 2.2-tonne GSAT-4 satellite into GTO.
Queried about the Rs.20 crore cost increase for the rocket, the earlier one cost around Rs.160 crore in 2007, Satish said: “Compared to the previous GSLV rockets this is taller by one metre and weighs two tonnes more. The rocket has a bigger heat shield. One also has to factor the cost escalation aspects over the years.”
The notable aspect of this launch is that the rocket will be powered by ISRO-designed and built cryogenic engine (development cost around Rs.350 crore).
If the cryogenic engine performs as expected, India will become the sixth country in the world to design and develop the cryogenic technology.
The two other unique features of the rocket are its larger composite payload fairing or heat shield and the advanced telemetry systems and mission computers.
After a gap of several decades, the Indian space agency has reverted to fibre reinforced plastic (FRP) heat shield for its rocket.
The GSLV-D3 rocket has a bigger heat shield - four metre diameter - as compared to the earlier rocket versions whose heat shield were of 3.4 metre diameter and were made of aluminium alloy metal.
- Countdown on for rocket launch with Indian cyro engine (Lead) - Apr 15, 2010
- Weak Russian component downed Indian rocket: Ex-ISRO chief - Apr 22, 2011
- GSAT satellite all set for launch (Lead, Changing dateline) - Dec 25, 2010
- Countdown for GSAT satellite launch begins - Dec 25, 2010
- Countdown begins for GSLV-D3 launch at Sriharikota - Apr 14, 2010
- India's second moon mission Chandrayaan-2 to wait - Apr 26, 2012
- Countdown begins for GSAT launch Saturday - Dec 24, 2010
- Countdown for India's advanced satellite launch begins Sunday - Dec 18, 2010
- India to launch advanced communication satellite Dec 20 - Dec 13, 2010
- Rocket failure: Russian, Indian scientists differ on cause - Feb 22, 2011
- Plastic heat shield to protect Indian space rocket - Apr 14, 2010
- India to launch advanced communication satellite April 15 (Second Lead) - Apr 07, 2010
- India gets ready to fire its own cryogenic rocket engine (Lead) - Apr 14, 2010
- Rocket failure: ISRO awaits data from Russia - Jan 28, 2011
- ISRO set to launch GSLV-D3 today - Apr 15, 2010
Tags: communication satellite, crore, heat shield, hydrogen as fuel, indian rocket, indian space research, indian space research organisation, isro, launch pad, launch vehicle, liquid fuel, liquid hydrogen, liquid oxygen, liquid propellants, rocket blasts, satish, solid fuel, spaceport, synchronous orbit, transfer orbit