Kashmir’’s first-ever train service commences today
October 12th, 2008 - 3:44 pm ICT by ANI ( Leave a comment )
Srinagar, Oct 12 (ANI): The first ever train service in Kashmir valley commenced on Sunday.
The train left Budgam at 7:10 a.m. and arrived at Anantnag on 8:45 a.m. The train will depart from Budgam at 2:25 p.m. and will reach Anantnag at 4:00 p.m.
The train, which is expected to cover the 66-km in about 1 hour and 35 minutes including stoppage time at various stations, will be run twice a day from either side.
The stoppages are at Budgam, Srinagar, Pampore, Kakapora, Awantipora, Panjgam, Bijbehara, Rajwansher and Anantnag. The fare for the travel is 15 rupees.
The railway line between Srinagar and Jammu is 345 km long and is biggest project of the Indian Railways since independence.
The project is called Jammu-Udhampur-Katra-Qazigund-Baramulla link (JUKQB). The Baramulla-Qazigund link is 119 km long and is the third part of the project.
There are eight-coach DEMU rake in the train. The coaches have a seating capacity for 90 passengers and the compartment meant for physically challenged persons will have wider doors.
In view of the climate of the valley, 1400 horsepower diesel engine for the train has been provided with heating system for quick and trouble free starting in winters.
The driver’’s cab has heating and defogging unit keeping in view the cold climate. Snow cutting type cattle guard is attached at the driver’’s end of the train for snow clearance from tracks during winter.
On Saturday, Prime Minister Dr. Manmohan Singh flagged off the train from Srinagar railway station at Nowgam.
The train was flagged off ten years after the project was started by the then Prime Minister Inder Kumar Gujral. (ANI)
- Prime Minister flags off Kashmir's dream train - Oct 11, 2008
- Kashmir rail services back on track - Nov 24, 2011
- History and hope ride on Kashmir's hi-tech train - Oct 11, 2008
- Militants attack Kashmir rail (Second Lead) - Apr 02, 2010
- PM flags off Kashmir train amid shutdown call (Second Lead) - Oct 11, 2008
- Militants blow up rail track in Kashmir (Lead) - Apr 02, 2010
- Two train accidents injure 21 - Nov 23, 2011
- PM inaugurates historic railway link in Kashmir - Oct 28, 2009
- Tracking Jammu and Kashmir's rail history - Oct 28, 2009
- Work commences on Udhampur-Baramulla rail project - Dec 03, 2009
- Rail service resumes in Kashmir Valley - Dec 24, 2010
- Curfew continues in Srinagar; situation remains normal in Valley - Sep 19, 2010
- Locals demand rail service to be resumed in Baramulla - May 01, 2011
- Over 1,200 stranded passengers ferried by IAF (Second Lead) - Jan 22, 2012
- After 5 months, Kashmir rail services back on track - Dec 23, 2010
Tags: anantnag, cattle guard, cold climate, diesel engine, dr manmohan singh, horsepower diesel engine, inder kumar, indian railways, jammu, kashmir valley, katra, manmohan, manmohan singh, railway line, railway station, rupees, snow clearance, stoppage time, stoppages, train service