NASAs Ares I rocket first stage igniter successfully tested
March 11th, 2009 - 2:02 pm ICT by ANIWashington, March 11 (ANI): NASA has completed a successful test firing of the igniter that will be used to start the Ares I rocket first stage motor.
The March 10 test paves the way for the initial ground test of the Ares I first stage later this year.
Ares I is the first launch vehicle in NASAs Constellation Program family of space vehicles that will transport astronauts and cargo to the International Space Station (ISS), the moon and beyond in coming decades.
This successful test represents a milestone in our continuing development of the Ares I first stage, said Alex Priskos, first stage manager for the Ares Projects at NASAs Marshall Space Flight Center in Huntsville, Alabama.
We continue to design a robust propulsion system that will provide a safe and reliable means of transportation for NASAs future missions of exploration, he added.
The test, conducted at ATK Launch Systems test facilities near Promontory, Utah, generated a flame almost 200 feet in length.
Initial data showed the igniter performed as expected.
The Ares I igniter is an enhanced version of the flight-proven igniter used in the space shuttle’’s solid rocket boosters.
The igniter takes advantage of upgraded liner and insulation materials that have improved thermal properties which protect the igniters case from the burning solid propellant.
The new igniter is approximately 18 inches in diameter and 36 inches long.
It is a small, high-burn-rate solid rocket motor that is secured in the forward segment of a five-segment booster.
Once the command is sent to the igniter, a sequence begins that sends a flame down the core of the 142-foot solid rocket motor.
In less than a second, the booster generates more than 3.5 million pounds of thrust, triggering liftoff of the rocket.
The Ares I rocket is an in-line, two-stage rocket topped by the Orion crew capsule; its service module and a launch abort system.
The first Ares I test flight, called Ares I-X, is scheduled for later this year. The first crewed flight of Orion is planned for 2015, with the first lunar excursion scheduled for 2020.
NASAs Constellation Program, which is building the spacecraft that will return us to the moon, includes the Ares I rocket, the Ares V heavy cargo launch vehicle, the Orion crew capsule and the Altair lunar lander. (ANI)
- NASA's Orion 'moon' craft that could put man on asteroid unveiled - Mar 23, 2011
- NASA presents new launch system with eye on Mars - Sep 15, 2011
- NASA, ATK successfully test largest and most powerful solid rocket motor - Sep 01, 2010
- US private firm aborts launch to space station - May 19, 2012
- First private spacecraft launched to space station - May 22, 2012
- NASA's next generation rocket makes booming debut - Oct 29, 2009
- NASA's Ares I-X rocket successfully completes flight test - Oct 29, 2009
- New 'low cost' rocket to lift astronauts set to soar by 2013 - Feb 09, 2011
- NASA remembers storied past, but looks to uncertain future (Flashback 2009) - Dec 30, 2009
- First commercial spacecraft docks with space station - May 26, 2012
- NASA's Space Shuttle Program Retirement Delayed Until 2011 - Jul 03, 2010
- India tests rocket booster for heavier satellites - Jan 24, 2010
- NASA tests largest rocket parachutes ever for Ares I rocket - May 21, 2009
- India tests rocket booster for heavier satellites (Lead) - Jan 24, 2010
- ISRO successfully tests propellants system of GSLV-M III - Sep 09, 2010
Tags: flame down, ground test, high burn, huntsville alabama, insulation materials, international space station, launch systems, launch vehicle, marshall space flight, marshall space flight center, nasas, promontory utah, propulsion system, rocket motor, solid propellant, solid rocket, space flight center, space station iss, stage motor, stage rocket