ESAs GOCE satellite completes early orbit phase
March 21st, 2009 - 4:07 pm ICT by ANIParis, March 21 (ANI): The European Space Agencys GOCE satellite has completed its early orbit phase.
During the critical Launch and Early Orbit Phase, beginning with separation from its booster on March 17, GOCE ( Gravity field and steady-state Ocean Circulation Explorer) was checked out to confirm that all of its control systems are operating normally.
The end of the Launch and Early Orbit Phase (LEOP) came overnight after GOCE ( Gravity field and steady-state Ocean Circulation Explorer) was switched to Fine Pointing Mode.
This means that all of its systems are working normally and the satellite is ready for full commissioning of its scientific instruments.
With the end of LEOP, normal communications between the satellite and the ground are now being provided by ESAs ESTRACK station at Kiruna, Sweden.
Everything is working well and we have a healthy satellite. Today, we will end round-the-clock staffing in the Main Control Room and move the Flight Control Team to regular work-day operations in the Dedicated Control Room, said Flight Operations Director Pier Paolo Emanuelli at ESAs European Space Operations Centre (ESOC), Darmstadt, Germany.
A major aim of the LEOP was to bring the Satellite-to-Satellite Tracking Instrument (SSTI) - a highly accurate GPS (Global Positioning Satellite) receiver - into full operation.
Emanuelli confirmed that it is working normally.
Switching on the SSTI was especially important, as this meant the satellite could start performing its own autonomous orbit determinations, he said.
SSTI identifies GOCEs position very accurately, and we need this functioning before we can bring the satellite into its final drag-free operations mode, he added.
In addition to providing realtime navigation data for flight control, SSTI is one of GOCEs two payload instruments and it is a very accurate scientific tool for recording and reconstructing the satellites actual orbit.
The first SSTI data have already been received at the Payload Data Ground Segment at ESA’’s Earth Observation Centre (ESRIN), Frascati, Italy.
According to GOCE Mission Manager Rune Floberghagen, Receiving initial science data from SSTI so soon has been an excellent first step and, now that the SSTI is operating, we are already proceeding with commissioning of the scientific payload.
GOCE is operating very well, and we are already looking forward to commissioning our other main instrument, the Electrostatic Gravity Gradiometer, starting in mid-April, he added. (ANI)
- Goce satellite data allows boffins to map Earth's gravitational pull - Jun 29, 2010
- GOCE satellite maps Earth's gravity with precision - Mar 05, 2011
- Gravitational force in the Himalayas being determined - May 08, 2010
- ESA's satellite sends data for development of best gravity map ever - Oct 01, 2009
- Launch of CryoSat-2 ice satellite successful - Apr 09, 2010
- GOCE satellite probing how pull of gravity varies across Earth - Dec 25, 2009
- ESA satellite to map Earths gravity field in unprecedented detail - Mar 18, 2009
- Russian rocket puts European satellite into orbit - Mar 18, 2009
- ESAs gravity mission to launch on March 16 - Feb 05, 2009
- Space-borne laser instruments needed to measure volcanic ash: Scientists - May 30, 2010
- Indian mega satellite spins in geo transfer orbit (Second Lead) - May 21, 2011
- CryoSat to investigate Earth's ice cover - Feb 16, 2010
- Indian satellite to be launched May 20 from Kourou - May 14, 2011
- ESA's Hylas-1 released in space - Nov 27, 2010
- India launching satellite to study tropical climate - Sep 10, 2011
Tags: darmstadt germany, esoc darmstadt, european space operations, european space operations centre, flight control team, free operations, global positioning satellite, gravity field, kiruna sweden, leop, navigation data, ocean circulation, orbit phase, paris march, payload instruments, pier paolo, satellite receiver, satellite to satellite, space operations centre, ssti