US blames BP’s poor decisions for Gulf oil spill
September 15th, 2011 - 12:06 pm ICT by IANS
Washington, Sep 15 (IANS/EFE) Poor management decisions by BP Plc at its Macondo well in the Gulf of Mexico were the main causes of last year’s disastrous oil spill, US agencies said Wednesday.
The final joint report by the Coast Guard and the Bureau of Ocean Energy Management, Regulation and Enforcement cited as the main cause of the April 20, 2010, disaster “BP’s cost- or time-saving decisions without considering contingencies and mitigation”.
According to the report, the explosion that killed 11 people and spilled almost 5 million barrels of oil into the ocean was the result of “poor risk management, last-minute changes to plans, failure to observe and respond to critical indicators, inadequate well control response, and insufficient emergency bridge response training by companies and individuals responsible for drilling at the Macondo well and for the operation of the Deepwater Horizon” rig.
The oil industry had been anxiously awaiting the report due to its potential impact on deep-water drilling permits.
In January, a commission named by President Barack Obama to probe the disaster had divided the blame between BP and subcontractors Halliburton and Switzerland-based Transocean.
But the Coast Guard/BOEMRE report, while not absolving the contractors, assigns the biggest share of the blame to the British energy giant.
Many of BP’s decisions, including neglecting to test the stability of the cement used to seal the well, were “in direct contradiction” to the federally approved, risk-minimizing operating plan.
BP should have taken responsibility for the oil rig’s maintenance - even though it was operated by Transocean - as well as the cement work on the well and the inspection requirements for the oil spill-prevention system, whose failure was the final trigger for the disaster.
The report contains dozens of recommendations for improving industry safety, including suggestions for improving spill-prevention systems and ensuring that rig engines do not absorb gas.
It also says rig operators must be required to provide better reports on their drilling processes to the government, which for the first time would monitor problems at oil wells.
Lastly, it points to the possibility of renewing surprise inspections at Gulf oil rigs, a practice that had been discontinued in recent years.
–IANS/EFE
rd
- US allows BP to drill new Gulf deepwater wells - Oct 22, 2011
- Transocean gives bonuses for 'safety' after Gulf of Mexico oil spill - Apr 04, 2011
- BP's 'cost-cutting decisions' blamed for 'avoidable' Gulf of Mexico oil spill - Jan 06, 2011
- BP to pay $7.8 bn to victims of oil spill - Mar 05, 2012
- "Poor safety culture" onboard Deepwater Horizon led to last year's massive Gulf oil spill - Apr 23, 2011
- Deepwater Horizon rig plugged and "effectively dead" - Sep 20, 2010
- BP seeks to resume drilling in Gulf of Mexico - Apr 04, 2011
- BP sues Cameron, Deepwater Horizon owner Transocean over Gulf of Mexico oil spill - Apr 21, 2011
- Investigation report blames failure of 'blowout preventer' for Gulf of Mexico oil spill - Mar 24, 2011
- Disastrous BP oil well finally killed - Sep 20, 2010
- BP ignored warning signs in Gulf oil well blowout, suggests report - Nov 18, 2010
- Seal completed on BP's Gulf of Mexico disaster well - Sep 19, 2010
- BP working on new approach as Obama loses patience - May 15, 2010
- Attorneys take legal action against BP and others involved in Deepwater Horizon oil spill disaster - May 08, 2010
- US terms reports of BP resuming Gulf of Mexico drilling as 'misconception' - Apr 05, 2011
Tags: bp plc, bridge response, british energy, cement work, control response, critical indicators, emergency bridge, energy giant, macondo, management regulation, ocean energy, oil rig, oil spill prevention, poor decisions, poor management decisions, poor risk, prevention system, prevention systems, water drilling, well control