‘Regulating various nuclear reactors in India a challenge’
October 12th, 2010 - 9:06 pm ICT by IANSMahabalipuram (Tamil Nadu), Oct 12 (IANS) The expansion of India’s nuclear power sector with the setting up of mega sized reactors of differing technologies - light water, fast breeder and advanced heavy water - poses a challenge to the sector’s regulator, a senior official said Tuesday.
“We have good experience and well-documented safety measures pertaining to pressurised heavy water reactors (PHWR). The new challenge is from imported light water reactors and the domestically designed fast breeder and advanced heavy water reactors,” said R.I. Gujarathi, director, Nuclear Projects Safety in the Atomic Energy Regulatory Board (AERB).
Speaking on the challenges of atomic energy regulation in the changed Indian context at the Asian Nuclear Prospects (2010) a conference on nuclear energy in Asia, he said India is going to increase its atomic power capacity nearly ten-fold over the next ten years but the series of imported light water reactors will have to adhere to the current Indian regulations.
“The challenge is in the differences in standards and codes and their validation between the Indian equipments and that of imported ones,” Gujarathi said.
According to industry officials, it will be the Nuclear Power Corporation of India Ltd (NPCIL) that will discuss with AERB on the safety aspects of the imported reactors in its capacity as the plant operator.
The AERB is looking at the feasibility of drafting technology neutral safety rules, Gujarathi said, adding the regulator will be doubling the head count to 400 during the 12th Five Year Plan period.
He said AERB is also planning to set up regional regulatory centres in south, east and north India to effectively monitor the growing number of diagnostic labs using radio nuclides - material used for diagnostic and treatment of ailments.
“We are also pursuing with the state governments to set up a directorate of radiation safety,” he added.
- Change of guard at Kudankulam N-plant - Apr 30, 2012
- Ex-atomic energy chief opposes n-reactor import - Apr 03, 2011
- Ex-atomic energy regulator opposes n-deal with US (Lead) - Apr 04, 2011
- Robots to fabricate fuel for new Indian nuclear reactors - Oct 12, 2010
- Asian nations need to cooperate in nuclear field - Oct 11, 2010
- 'India gaining from N-renaissance in Asia' - Oct 11, 2010
- Indian nuclear plants to bolster safety measures - Dec 11, 2011
- Petitions against Kudankulam reactors dismissed by Madras High Court - Aug 31, 2012
- Top level changes at two atomic power operators (Lead) - Jun 01, 2012
- Madras HC seeks details of Kudankulam power project - Aug 21, 2012
- 'India can't produce 20,000 MW n-energy by 2020 - Apr 04, 2012
- US nuclear safety experts to visit India - Nov 05, 2011
- Major pre-fuel loading exercise over at Kudankulam - Sep 12, 2012
- Kudankulam to comply with AERB stipulations - Sep 17, 2012
- Kudankulam safe but fuel loading permission not given: Atomic panel - Sep 13, 2012
Tags: atomic energy regulatory board, atomic power, diagnostic labs, drafting technology, energy regulation, heavy water reactors, india ltd, indian context, light water reactors, north india, npcil, nuclear power corporation, nuclear power sector, nuclear projects, nuclear reactors in india, plan period, radiation safety, safety measures, state governments, tamil nadu